How do Power BI developers handle version control?

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

How do Power BI developers handle version control?

royben239
Power BI developers handle version control using tools like Git or integrating Power BI with version control systems like Azure DevOps. This ensures that all changes to reports, data models, or queries are tracked and reversible if needed. Power BI developers create branches to experiment with new features without disrupting the main production environment and collaborate with other team members effectively by managing merges and resolving conflicts. Version control allows Power BI developers to maintain the integrity of their solutions, ensuring continuity and reliability in report development while enabling innovation.