Robert Dougherty a écrit :
> Fabrice,
>
> This appeared in ImageJ version 1.38m. Look for More>> at the bottom of the
> panel in ROI Manager.
>
> Bob
>
> Robert P. Dougherty, Ph.D.
> President, OptiNav, Inc.
> Phone (425) 990-5912
> Fax (425) 467-1119
> www.optinav.com
>
>
>
>> -----Original Message-----
>> From: ImageJ Interest Group [mailto:
[hidden email]] On Behalf Of
>> Senger Fabrice
>> Sent: Tuesday, October 23, 2007 3:33 AM
>> To:
[hidden email]
>> Subject: ROI Manager and Multi-measure
>>
>> Hi,
>>
>> did someone ever considered to combine the functionnalities of the ROI
>> Manger and the Multi-Measure.
>> It would be interesting to use the same tool when dealing with multiple
>> ROI's.
>>
>> Thank you very much,
>>
>> Fabrice.
>>
>> --
>> Senger Fabrice
>>
Yes ,
And first, thank you very much for your answer.
I had a close look to those features but when I compare the latest
version of "Mutli-Measure" and "ROI-Manager" there features wich are
not shared and it would be much straight forward at least for me to
combine them, for example :
in ROI manager : Open All ( for now I use the macro "open all", but i'm
not able to combine both tools) ;
Select All ; and :
in Multi-Measure : Show All (very helpfull and non destructive overlay
as opposed to draw), Rename would be nice aswell (especially if it could
recursively rename all considered ROI's).
My initial plan was to try to copy-paste code between the tools, but
this seems to be a simplistic view ?
Once more thank you for advice and support,
Fabrice.
--
Senger Fabrice