|
Hey,
I have a 2 channel composite 16 bit image with 21 Z-sections per channel and 100 timepoints. I then maximum project the Z-sections to yield a 2 channel composite with 100 timepoints. I then want to use the reslice command to reslice through time to generate a 2-channel composite kymograph. However, i get the error “cannot reslice through Z=1 hyperstacks”. Is there a way around this? The reslice command doesnt have any problems reslicing through the time dimension in single channel hyperstacks in which Z-sections have been projected.
Thanks folks
Mike
|